Transit Corridors
Mumbai Metro Lines
16 listed lines · 6 operational · 4 under construction · 6 proposed · 206 listed stations · 95 active stops
Lines by operator
Mumbai Metro (MMRC) · 15 lines
Aqua Line
Operational
Aarey JVLR⇄Cuffe Parade
28 operational stopsDetails
Blue Line
Operational
Versova⇄Ghatkopar
12 operational stopsDetails
Gold Line
Proposed
Alignment under development
Planned corridor · Alignment under surveyDetails
Green Line (Gaimukh–Bhakti Park (Wadala))
Under construction
Gaimukh⇄Bhakti Park (Wadala)
Planned corridor · Alignment under survey· 34 listedDetails
Green Line (Shivaji Chowk (Mira Road)–Gaimukh)
Proposed
Shivaji Chowk (Mira Road)⇄Gaimukh
Planned corridor · Alignment under survey· 5 listedDetails
Green Line (Bhakti Park (Wadala)–Chhatrapati Shivaji Maharaj Terminus (CST))
Proposed
Bhakti Park (Wadala)⇄Chhatrapati Shivaji Maharaj Terminus (CST)
Planned corridor · Alignment under survey· 11 listedDetails
Magenta Line
Proposed
Alignment under development
Planned corridor · Alignment under surveyDetails
Orange Line (Kapurbawdi–Kalyan APMC)
Under construction
Kapurbawdi⇄Kalyan APMC
Planned corridor · Alignment under survey· 17 listedDetails
Orange Line (Kalyan APMC–Amandoot(Taloja))
Proposed
Kalyan APMC⇄Amandoot(Taloja)
Planned corridor · Alignment under survey· 19 listedDetails
Pink Line
Under construction
Swami Samarth Nagar (Lokhandwala)⇄Vikhroli EEH
Planned corridor · Alignment under survey· 13 listedDetails
Purple Line
Proposed
Alignment under development
Planned corridor · Alignment under surveyDetails
Red Line (Dahisar East–Gundavali)
Operational
Dahisar East⇄Gundavali
18 operational stops· 20 listedDetails
Red Line (Subhash Chandra Bose Stadium–Dahisar East)
Under construction
Subhash Chandra Bose Stadium⇄Dahisar East
Planned corridor · Alignment under survey· 5 listedDetails
Yellow Line 2A
Operational
Dahisar East⇄DN Nagar
18 operational stopsDetails
Yellow Line 2B
Operational
Chembur⇄Mandale
6 operational stops· 20 listedDetails